Micheldever Recycling Depot
Micheldever Depot is an ex-asphalt plant from the 1990’s, the site had to be cleared and levelled to enable a large-scale drainage system, the site clearance uncovered multiple unexpected oil interceptors and existing structures which we were able to safely remove and dispose of to allow us to reach our deadline for opening.
Thruxton Down
Drainage Solution
The underpass of the A303 at Thruxton Village has flooded for over 20 years, the location is very sensitive due to its proximity to the famous Thruxton race Circuit.
We worked tirelessly with the client’s design engineers before the site began construction to produce a solution to solve the flooding issue once and for all at this low level area.
Langstone Harbour
The sea wall at Langstone has required attention for a number of years but the location was always deemed too difficult to work on. The seaweed and salt water had slowly infiltrated the mortar and had caused severe damage in some areas, the water had also created a void behind large sections causing the footway above to being to collapse.